District heating plant, Laces

Via Nazionale 2a, Laces (BZ), Italy

Function
Industrial
IPV Architectural elements
Opaque façade | Rainscreen | Cladding | Glass façade | Curtain wall
PV Integration Year
between 2006 and 2010
Source
Eurac Research

Project Data

Project type
New construction
PV integration year
2009

IPV System Data

Module dimensions (mm)
1,600 x 800
System power (kWp)
48.9
System area (m²)
446.7
Modules orientation
South, West
Modules tilt [°]
90

IPV System Costs

Total cost (€)
357,416
€/m²
800
€/kWp
7,309

Information and data provided by: Eurac Research

Introduction

The district heating plant is placed below a wooden slope of the Ötztal Alps. The photovoltaic system is integrated on the West- and South-facing building façades.

Aesthetic integration

The BIPV system creates a dark envelope, which is aesthetically embedded in the surrounding landscape. The modules comply with the irregular shape of the building. The plan was designed based on the biomass burners (Eng. Klaus Fleischmann) and the fronts follow the sloped roof, where another PV plant is applied.

Technology integration

The integrated PV modules (Solarwatt M140-36 GEG LK XL) are standard semi-transparent glazed panels made of 36 monocrystalline cells. On the building’s west façade, they are fixed through aluminium profiles to the opaque concrete surface with a distance of 8 cm. The air gap generates a stack effect that guarantees the modules natural ventilation. On the building’s south façade, the modules are used as an exposure opening for the burner house, creating a warm façade directly exposed to the internal space. Thanks to a 10–20% transparency, they allow a natural illumination inside. The same mounting system is fixed to a wooden structure.

Energy integration

Together with the roof PV system, the integrated modules are measured to cover the 20–30% of the electricity building demand, mainly required by the burners (Eng. Klaus Fleischmann).

Decision making

The building owner (EGL cooperative energy company of Laces) decided to equip the building with a PV plant to partially cover the electric demand of the biomass burners. This was inspired by the provincial programmes aimed to promote solar energy production (Eng. Klaus Fleischmann). The use of renewable energy, which is locally generated, decreases the costs and the environmental impact of the district heating plant. The initial idea was to build a plant on the roof. Later it was decided to install an additional plant on the façades, using the semi-transparent glass modules (Eng. Klaus Fleischmann). Public institutions (European, national and regional) played a crucial role in planning and partially financing the works.

Lessons learnt

On the south-facing facade, the photovoltaic modules are integrated also replacing transparent glazed surfaces. Other than performing the common functions of building envelope components, they are used as shading devices, guaranteeing the internal visual comfort. The same modules are integrated covering opaque surfaces to give a uniform appearance to the building façades. For the same reason, some fake modules were used (non-rectangular modules) on the top of the West facade, following the sloped roof profile. During the construction works, some panels turned out not to have the correct size and were replaced with other ones. (Eng. Klaus Fleischmann)

Architectural Elements involved

Stakeholders involved

Wallnöfer Günther & Rudolf Snc
IPV installer
SOLARWATT GmbH
IPV producer
Contact us

Get expert support to design, evaluate or validate your IPV projects

Contact us now
Icon for join the community